A lazy image

Bridge Beams for Gas Works Access Bridge

A project completed this summer was Gas Works Access Bridge for BAM Nuttall Ltd.

They awarded Shay Murtagh Precast with the manufacture of the concrete bridge beams for this extension to a bridge in Chelsea Harbour, London.

Bridge Beam Specifications

  • 2 No. 9.227m Cill Beams
  • 1 no parapet beam – 10.22m
  • 4 no internal bridge beams consisting of concrete encased steel bridge beams
  • (3 no beams consisting 3 steel beams encased in concrete per beam, 1 no with 4 steel beams encased in concrete – all 10.22m)

Bridge Beam Manufacturing

These pre-stressed concrete beams are manufactured by dedicated personnel, ensuring quality.

Our testing procedures ensure that each project is manufactured to the requested specification.

We worked with Paul and the installation team to deliver the beams to schedule in July 2012.  We thank all the BAM Nuttall team and look forward to the next project.

More information on the full range of Bridge Beams.