Shay Murtagh Precast supplied nine 16.4m long prestressed precast box beams for Leyburn Bridge deck reconstruction. The beams were 970mm wide by 550mm deep and each weighed 20.5T. The precast box beams were manufactured with skewed ends to accommodate the bridge alignment. A 380mm high by 550mm wide concrete upstand was cast on both the outer beams in the factory. Two 1050mm wide cill beams with thickness varying from 359mm to 639 also formed part of this contract. Each cill beam weighed 15.4T.