Design, manufacture, supply and erect 8 no Prestressed and Post Tensioned concrete storage tanks for waste water treatment plant in Waterford.
About the Project
Shay Murtagh Provided Post Tensioned Concrete Storage Tanks
Project Description
The treatment plant will treat domestic, commercial and industrial wastewater from Waterford City and Environs. The design capacity of the plant is for a population equivalent of 188,000. The Works comprise the design, specification, procurement, supply, construction, commissioning, testing, operation and maintenance of a complete, fully functioning wastewater and sludge treatment and recycle/reuse system including final effluent outfall.
Concrete Works
The Stormwater storage tanks have a diameter of 32m and the base was constructed of reinforced concrete with a conical base.
The Primary settlement tanks have a diameter of 34m and the base was constructed of reinforced concrete with a conical base The walls are placed in a reinforced concrete ring beam was poured at the
The Final settlement tanks have a diameter of 36m and the base was constructed of reinforced concrete with a conical base.
Technical Information:
Settlement Tank | Diameter:32.64m | Wall Height: 3.365m | Quantity:4 |
Storm Tank | Diameter: 36.46m | Wall Height:2.665m | Quantity:2 |