Bridge Beams for Porthmadog By-pass

Shay Murtagh Precast, in conjunction with Balfour Beatty manufactured and delivered precast bridge beams for three bridge decks on this project. This included fourteen 17.1m long Y1 beams eighteen 14.9m long TY7 beams sixteen 12.7m long TY5 beam All bridge beam units were 2m long and ranged in size from 1.5m x 1.5m with 200mm thick […]

A lazy image

M50 D & C Ltd – M50 Motorway Upgrade

About M50 Motorway Upgrade The M50 Motorway Upgrade (Phase 2) PPP Contract comprises the design, construction, operation, maintenance and financing of the upgrade. Approximately 24 km of the existing two lane carriage-way to three lane standard. The provision of auxiliary lanes between the M1 and N3 junction and between the N7 and Scholarstown junctions. The major […]

A lazy image

Concrete Box Culvert Assembly at Inchya Road

In November 2011 Shay Murtagh Precast manufactured and delivered 10 UAN concrete box culvert assemblies on behalf of RJ McLeod contractors for Inchyra Road. Each box culvert assembly consisted of an upper and lower U-section to from a 5.7m by 2.4m culvert. Each U-section weighed 13.5T and was 1.941m long. All of the box culvert units […]

Form

Please enable JavaScript in your browser to complete this form.
Name

Email

Phone