Killybegs Water Supply Scheme

​The Killybegs Water Supply Scheme serves a population of approximately 4,000 people in the area, including the local fish processing industry. Due to its limited capacity, the water treatment plant faces the potential for supply disruptions and lacks sufficient facilities for sludge treatment.

This €12.5 million upgrade will ensure reliable and sustainable drinking water supply for both the residential and industrial sectors in Killybegs and the surrounding area.
EPS Group is carrying out the work on this project on behalf of Uisce Éireann.

This project involves the following works:

  • Upgrade the existing water treatment plant at the Killybegs site;
  • Provide sludge treatment facilities;
  • Provision of upgrade existing chemical systems;
  • Disinfection systems.

Our scope:

Shay Murtagh Precast ltd were engaged to design/manufacture and install the following 7no tanks:

  • 1no 14.280m diameter contact tank with 4.5m high wall panels.
  • 1no 8.460m diameter UWWEST Equalisation tank with 4.5m high wall panels
  • 1no 7.480m diameter UWWEST Settlement tank with 4.5m high wall panels
  • 1no 4.470m diameter Sludge balance tank with 3.9m high wall panels
  • 1no 6.690m diameter Sludge holding tank with 3.9m high wall panels
  • 1no 4.150m diameter Picket Fence thickener tank with 3.9m high wall panels
  • 1no 6.370m diameter Sludge Reception tank with 3.0m high wall panels