Latest News

A lazy image

Precast Bridge Beams for Old Lane Bridge Rebuild, Prescot, UK

Shay Murtagh Precast manufactured and delivered the precast units and precast bridge beams required for this project. Network Rail’s vision for faster, more frequent rail services between the region’s main cities. As well as plans to electrify the railway between Manchester, Liverpool, Huyton and Wigan commenced work in early January 2012.

A lazy image

Precast Concrete Tunnel Segments for C310 Thames Tunnel

Joint Venture partners HOCHTIEF Solutions AG and J Murphy & Sons Limited (HMJV) have been appointed by state owned Crossrail to undertake the prestigious €220 million C310 Thames Tunnel Project. This project will see the construction of two tunnel’s with a total length of around 5.5 kilometers in southeast London. Part of which runs under […]

A lazy image

New Concrete Bridge Beams Project for Piano Overbridge

In 2011 Shay Murtagh Precast designed, manufactured and delivered the new Concrete Bridge Beams Project for the Piano Overbridge Renewal by Birse Rail. Working with Steve and the Birse Rail Team an initial value engineering, carried out with the Shay Murtagh Design Team. With a substantial reduction in the number of prestressing strands required in […]

A lazy image

Precast Bridge Beams for Sandhills Lane bridge reconstruction

Shay Murtagh Precast has a long standing working relationship with Birse Rail. Sandhills Lane in Liverpool is a project where as part of a 2011 Christmas possession Birse Rail contracted us to manufacture precast elements for a bridge reconstruction. The replacement of an existing steel deck bridge . Shay Murtagh Precast were contacted to provide the precast […]

A lazy image

Concrete Box Culvert Assembly at Inchya Road

In November 2011 Shay Murtagh Precast manufactured and delivered 10 UAN concrete box culvert assemblies on behalf of RJ McLeod contractors for Inchyra Road. Each box culvert assembly consisted of an upper and lower U-section to from a 5.7m by 2.4m culvert. Each U-section weighed 13.5T and was 1.941m long. All of the box culvert units […]

A lazy image

Bridge Beams for Kilmallock OB292m Overbridge

Bridge Beams supplied for Kilmallock Overbridge Shay Murtagh Precast are long standing precast concrete suppliers to Irish Rail. In June 2011 we supplied three portal bridge frame assemblies for a new overbridge at Kilmallock, Co Limerick to the main contractor PJ Hegarty and Sons. Each portal assembly consisted of an inverted U-shaped portal bridge unit […]

Form